Not long at all! The solar installation itself, where our install crew comes and puts the panels on the roof, only takes one or two days.
The process from signing a contract to having the system turned on takes a little longer than that, but we are proud to be in the top 5% of the country for our speed to completion (confirmed by multiple industry sources). The longest wait times during the project are generally due to permitting departments at your local city or municipality, or inspectors from the city or the utility. You will get updates from our project team regularly throughout the process, so you never have to wonder what's going on.