Once all required prior steps are complete, the project is ready to be scheduled for installation. The ESP Installation Scheduling team will coordinate with the homeowner to arrange the installation date. Generally, the installation will be scheduled about a week ahead, though the exact timeframe may vary depending on the location of the project. Both the homeowner and the sales representative will receive notifications once the installation date is set.
Timeline
The scope of work will involve the installation of solar panels, inverters, and batteries, if applicable. Typically, the installation process can be completed within a day, but larger systems may require additional time. If a battery is included in the project, an extra day will be needed.