Overview
The ESP Permitting Team is dedicated to submitting plans to the local jurisdiction promptly, averaging a 2-business day turnaround from the time the design was completed. After submission, the permitting team follows up and retrieves the permit as soon as it becomes available.
The processing time for permits varies depending on the Scope of Work and the jurisdiction they are submitted to. On average, most permits are expected to be ready within 2-3 weeks.
To access the most current timelines for permit processing, we have prepared a comprehensive report that outlines the average timeframes for permit receipt, categorized by jurisdiction.
SolarAPP+
ESP utilizes SolarAPP+, a federal initiative designed to expedite solar permits. For a list of jurisdictions that currently adopt SolarAPP+, please use this link.